Renaming two portions of road in Drummond Street, Nunile

Published on Tuesday, 11 November 2025 at 8:26:00 AM

During the initiation of the Foggarthorpe Structure plan (2001) a 'roads plan' was produced
and supported by Council – this established a naming guide for the development. However,
a subsequent structure plan amendment permitted the construction of the Recreation
Centre - meaning the roads would no longer connect.

The two new proposed road names are being recommended for the eastern section of Drummond Street
coloured orange and blue on the map below. As part of this consultation includes the retirement of the name
Murray Walkway, as this name is not being used. The retirement of Murray Walkway will
support a continuous road name from the High School to the Goomalling-Toodyay Road

Map 

October 2025 OCM minutes

Your comments are requested.

Please send through to records@toodyay.wa.gov.au before close of submissions 5 January 2026